2009 Test With the GPCE Version of the MC Model






JIMENA 2009 08 28 18 UTC

0-120 hr Cumulative Probabilities

(L=low, M=medium, H=high, X=missing/unused)

Time (hr) 0 12 24 36 48 60 72 84 96 108 120
GPCE Category X M M H H H H H H H M
GPCE Value (nmi) 0 45 72 105 146 171 195 242 289 302 314

34 kt. Operational 34 kt. GPCE Difference (GPCE - Operational)
50 kt. Operational 50 kt. GPCE Difference (GPCE - Operational)
64 kt. Operational 64 kt. GPCE Difference (GPCE - Operational)