Molenar, Gosden
One 18Gb Hard Drive was added to the HP-J210 for use with the AWIPS. Two more 18Gb Hard Drives will be added, one for the HP-J210 and the other for the J280
The latest security and y2k patches have been installed on all RAMM Team HP Workstations. In addition, several new applications have been installed to support analysis of Advanced Microwave Sounding Unit (AMSU) data.
CIRA network upgrade plans have been coordinated with the ground station. The CIRA and Solar House 2 buildings will be upgraded to support interal LAN speeds of 100 MB/S in conjunction with the upgrade of the connection to main campus.